HFY LED runs an LED strip plant in Shenzhen, China, with COB die bonding at ±25 µm, four SMT lines at 18,000 m of strip per day, two platinum-cure silicone extrusion lines, a photometric laboratory with two spectroradiometers, and sealing and packing under one roof. Every reel is binned to SDCM ≤ 3 and burn-tested for 24 hours, and the plant is open to customer audits with two weeks' notice.

18,000 mStrip per day
29Units listed
25 ± 1 °CBinning room
2 weeksAudit scheduling notice
Production areas

What sits in each part of the building

Floor area per department matters commercially: it tells you how much work is in the shop and whether a large part can physically be handled.

Automatic SMT placement machine assembling LED strip panels on the production line at the HFY LED factory
620 m²

SMT Assembly Line

Automatic SMT lines placing LEDs onto flexible PCB panels with in-line optical inspection.

Flexible PCB panels are loaded into carriers and run through automatic placement, so every LED lands on its pad at the same offset from reel to reel. Consistent placement is what keeps colour and brightness uniform along a 5 m strip, and it is why the same SKU ordered today matches the one installed last year.

Automatic solder paste printer feeding LED strip PCB panels into the SMT line at the HFY LED factory
1,150 m²

Solder Paste Printing

Automatic solder paste printing ahead of pick-and-place, with 100% stencil inspection.

Solder paste is printed automatically onto every pad before components are placed. Paste volume decides whether a joint survives 50,000 switching cycles and a decade of thermal movement, so stencil condition and print alignment are checked on every panel rather than on samples.

Worker spraying silicone waterproof coating onto LED strip reels at the HFY LED factory
480 m²

Silicone Spraying & Sealing

Conformal silicone spraying and end-capping that gives strip its IP65–IP68 rating.

Finished reels are sprayed with even silicone coating and sealed with end caps before curing. Coating thickness and seal integrity decide the IP rating, so outdoor builds are pressure-tested after sealing instead of trusting the process alone.

Operator testing a finished LED strip reel for colour and brightness at the HFY LED factory
180 m²

Finished Product Testing

Every finished reel is lit, measured and inspected before it is approved for packing.

Operators power up each finished reel and check colour, brightness and continuity against the batch reference. A reel that does not match its bin record is pulled at this bench — not after it reaches a customer's installation.

Worker packing LED strip reels into export boxes at the HFY LED factory
540 m²

Assembly & Packing

Reel taping, accessory kitting, labelling and export packing of finished orders.

Reels are terminated, taped, labelled with the customer label and bin code, then packed per panel or per store for project work. Packing to the installation plan is what turns a correctly produced order into a correctly installed one.

Equipment list

Equipment, capacity and tolerance

Capacity tells you the volume each line can carry; tolerance is the process figure we hold, not the machine's positioning specification. Where a number depends on the product — cut length, power per metre, sorting step — it is stated on the product page instead of here.

Model Type Qty Travel / capacity Positioning Used for
ASM AD 830 COB die bonder 3 Reel up to 50 m ±25 µm placement 320 / 480 / 504 chips per metre, 8–10 mm FPC
Yamaha YSM20R SMT pick-and-place 4 FPC width 5–15 mm ±0.05 mm 45,000 components per hour, 0402 to 5050 plus QFN
Heller 1913 MK5 Reflow oven, 10 zone 4 — ±1.5 °C per zone Nitrogen atmosphere, 260 °C peak for SAC305
Koh Young KY8030 3D solder paste inspection 4 — ±1 µm height Inline SPI before placement on every line
Silicone extrusion line, custom Platinum-cure silicone extrusion 2 6×12 to 10×20 mm profile ±0.2 mm profile Neon flex and IP67 / IP68 tube builds
Nordson Asymtek SL-940 Conformal silicone coating 1 Reel up to 50 m ±5 µm coating IP54 and IP65 silicone coating
Everfine HAAS-2000 Spectroradiometer with 1 m sphere 2 380–780 nm at 1 nm ±2% flux, ±0.001 duv Reel binning and LM-79 reporting
Custom reel tester Automatic electrical test 3 Reel up to 50 m ±0.5% V and A Forward voltage, current and continuity per reel
Custom burn-in racks Ageing at rated current 2 2,000 reels capacity ±2 °C chamber 24-hour burn-in on 100% of reels
Custom pressure rig IP67 pressure test 3 0.3 bar ±0.01 bar 60-second hold on every outdoor assembly
ESPEC TSA-71 Thermal shock chamber 1 −40 °C to +125 °C ±1 °C Validation of new die attach and sealing processes

Equipment list current as of 2026. Model numbers are listed because buyers check them; if a specific model is required for your programme, confirm availability before quoting.

Photographs

The floor, as it runs

Audits and visits

Come and look at it

A factory page is a claim; an audit is evidence. We schedule customer audits and site visits within two weeks, covering the full route your order will take — incoming dies and FPC, die bonding, SMT, extrusion, sealing, binning and packing. Remote video audits are available where travel is impractical, with the camera walked to whichever line or record you want to see.

  • Two weeks' notice for on-site audits, including customer-specific checklists
  • Remote video audit with a live spectroradiometer measurement demonstration
  • Records available on site: calibration certificates, bin records, burn-in logs, LM-80 data
  • NDA signed before any customer drawing or FPC design is shown during a tour

Arrange a visit

CE — EMC Directive 2014/30/EU SHENZHEN PSI TESTING CO., LTD. LED Strip (LED Neon Strip), 29 listed HFY models
RoHS 2.0 — 2011/65/EU Annex II Shenzhen MTL Testing Technology Co., Ltd. LED Strip (LED Neon Strip), 29 listed HFY models
LM-80 / LM-79 test data Per LED package family Lumen maintenance and photometric data for strip families
UL / cULus Via joint application for OEM projects North American market, applied for together with the customer